Bitcoin mining meets AI computing
Two different industries, one shared foundation in infrastructure.…
Read moreSolar · Bitcoin mining · AI compute
Farm Futures builds one energy system for two computing workloads — Bitcoin mining and AI compute — backed by solar generation and industrial power. Explore the infrastructure, model the energy flow, and invest when you are ready.
Figures are labeled verified, estimated, planned or target — never blurred together.
The project
Most computing projects buy one kind of power and run one kind of workload. Farm Futures is designed differently: solar energy and industrial electricity feed a shared power system that runs both Bitcoin mining and AI computing, with an energy management layer deciding where each megawatt goes.
An infrastructure project combining energy generation, Bitcoin mining and AI computing under one roof.
The computing work the infrastructure performs — mining rewards and AI compute services — is the intended source of revenue.
Two workloads sharing one power system can be balanced against each other, making better use of every megawatt.
Infrastructure
Every figure below carries a status label. We publish values as verified only when they are backed by real operating data — anything else stays marked as planned, estimated or unavailable until it is confirmed.
About 50,950 m² of land.
About 11,000 m² in use: mining halls and solar.
About 3,000 m², plus a new hall for AI GPU servers.
On the wider site of about 500,000 m².
About five years before opening to the public.
Approximate value of the mining and GPU fleet.
Initial agreed allocation — editable by an administrator.
Initial agreed allocation — editable by an administrator.
About 18 MWp of solar panels on site.
About 40% of the farm's yearly energy.
Average from solar, wind and other sources: about 70 GWh a year.
Continuous draw of the mining fleet.
Antminer S19 Pro.
About 207–218 PH/s for the whole fleet.
Energy model
A live model of how available power splits between Bitcoin mining and AI computing. The values come from the project’s energy settings — administrators update them in the admin panel. Every result shown here is an estimate, not live operating data.
Investment plans
Three tiers, one set of conditions. Return information appears only when it has been approved and configured — never before.
$300 – $999
A first step into the project. Suitable for visitors who want to start small and follow how the infrastructure develops.
Illustrative annual range of 21–25% per year, distributed according to the project’s profit-distribution schedule. Principal stays locked for six months from confirmation.
$1,000 – $4,999
The mid-tier plan for investors taking a larger position while keeping the same conditions and full dashboard visibility.
Illustrative annual range of 26–30% per year, distributed according to the project’s profit-distribution schedule. Principal stays locked for six months from confirmation.
$5,000+
For larger commitments. Terms, conditions and any return assumptions are confirmed with you before payment.
Illustrative annual range of 31–36% per year, distributed according to the project’s profit-distribution schedule. Principal stays locked for six months from confirmation.
Partner leaderboard
Channel owners and creators who bring new investors are ranked every round. The top 15 are shown here by name, and the first three earn +1.5% / +1% / +0.5% on top of their 1% for the whole next round.
Codes closed · next round opens 24 Oct
The journey
From creating an account to tracking your investment — the whole journey in six steps.
Create an account with your email and a password.
Confirm your email where required.
Read the project, the plans and the risk disclosure.
Choose the tier and figure that suit you.
Send USDT over a supported network.
The backend confirms the transaction — a submitted reference alone is not confirmation.
Why us
The project is built on real infrastructure choices, not promises.
Specialized mining machines secured and cooled inside a purpose-built facility.
GPU servers positioned to serve growing demand for AI computing capacity.
Photovoltaic generation supplying daytime power directly to the computing equipment.
Grid and industrial supply that keep operations running around the clock.
A management layer that can shift power between workloads as conditions change.
Published figures are labeled verified, estimated, planned or target — never blurred together.
Your investments, statuses and updates collected in one clear account view.
Journal
Platform announcements, infrastructure progress and educational guides from the team.
Two different industries, one shared foundation in infrastructure.…
Read moreThe labels we use, and why they matter.…
Read moreDaylight power, predictable costs, steadier operations.…
Read moreReview the investment plans and the conditions that apply, then decide in your own time.